Commissioning

7.3 Commissioning - Windows XP Professional

SIMATIC IPC427C

40

Operating Instructions, 04/2009, A5E02414743-01

7.3

Commissioning - Windows XP Professional

7.3.1

Basic commissioning - initial startup

Requirements

● The device is connected to the 24 VDC power supply.
● Equipotential bonding is connected.
● The cables are correctly plugged in.

Configuring the operating system

When the computer is started with the power switch for the first time, the Windows XP

Professional operating system on the hard disk or SSD drive is configured automatically.
Proceed as follows:
1. Switch the device on using the On/Off switch. The PC performs a self-test (POST).

During the self-test, this message appears:
Press F2 go to Setup Utility or

Press ESC go to Boot Manager

2. Wait until this message is cleared, then follow the instructions on the screen.

NOTICE

The device may not be switched off at any time during the installation process.
Do not change the default BIOS settings, otherwise the operating system setup may

become corrupted.

3. Automatic restart

After you have entered all necessary information and the operating system is configured,

the PC is automatically restarted and displays the user interface of the operating system.

Note
System startup can take considerably longer than usual for the initial commissioning.

When you switch on the PC now, the user interface of the Windows XP Professional

operating system is automatically opened when the startup routine is completed.

Note
To prevent data loss, it is advisable to create an image of your system partition after initial

commissioning.